Mir Status Report 17 September 1997

NASA MIR Program / Mir 24 / NASA 5 Status
Date: Wednesday, September 17, 1997// MD 43/125

Mir Station System/Subsystem Activities

Early today, the gyrodynes were reactivated. Six were nominally spun up, but four appear to have sustained damage to the electronic control units during the off-nominal powerdown of Kvant-2 following Sunday's failure. The crew is working today to replace these electronics units, and flight controllers hope to get those four gyrodynes spun up this evening. On the final comm pass of the evening, Mike reported that he could hear the four gyrodynes spinning up.

Kristall batteries have been reconnected, and SRV-K and SRV-U are on.

Mir Payload Activities
Greenhouse Daily Ops
Greenhouse Program 3
Interactions

OTHER ACTIVITIES
Cognilab
Mir Cable Installation

Stowage/Transfer - MOST informed Mike that a new r/g containing items to be transferred during the docked phase (non-prepack) was in work. Mike expressed concern that as many items a possible be prepacked, i.e., docked phase time needs to be used for handover. On the next comm pass, MOST provided Mike with an overview of what his docked phase activities will be, as well as those of the NASA 6 crewmember.

SMP/Medical - A no mission impact Private Medical Conference (PMC) was completed today.

Environmental Parameters (Previous 24 hour period):
Parameter Min. Max. Nominal Range
Pressure (mmHg) Base Block 615 623 660-850
ppO2 (mmHg) 150 155 140-200
ppCO2 (mmHg) 4.3 4.7 up to 8.0
ppH20 (mmHg) 13.0 13.7 8-14
Humidity (percentage) 53 62 30-75
Temperature (xC) base block (BB) 23.9 25.2 18-28

Communications Summary
A/G with Consultants Group
10:46-10:51 Prepacking; Greenhouse; Camcorder
11:01-11:07 Greenhouse; Camcorder
19:13-17:18 Prepack vs. non-prepack, Docked Phase overview

Planning
MIR 24/NASA 5 MD 44/126
Greenhouse Daily Ops
PAO Event -- weekly status
Beetle Ventilation and Power Status Check

  • submit to reddit


Loading



Humans to Mars Summit 2019
Military Space Situational Awareness April 1 - April 2, 2019, London, UK
MilSatCom USA conference will return to Washington from the 26th – 27th June 2019
Space Access Conference 2019
Mission To Methonē by Les Johnson - Baen Books




Join our mailing list




Monthly Archives

About this Entry

This page contains a single entry by Keith Cowing published on September 17, 1997 8:45 PM.

Mir Status Report 16 September 1997 was the previous entry in this blog.

Mir Status Report 18 September 1997 is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.