Shuttle Scheduling Update
Editor’s note: Last week a CR (Change Request) wasapproved outside the PRCB (Program Requirements Control Board) which directs an orbiter swap for STS-121and STS-115 – a swap which had beenknown for a long time. This CR alsomoves STS-116 to Endeavour. While the CR directs products to be generated and released, itdoesnotupdatethe FDRD (Flight Definition and Requirements Directive) – even though the CR had launch dates contained within it.A formal FDRD update is scheduledfor either the 10 Nov or 17 Nov PRCB.