Minor Hubble Glitch

NASA Hubble Space Telescope Daily Report # 4470

"SIGNIFICANT EVENTS:

Gyro 2's second flex lead failed on DOY (278) 10/05/07. An increase in the gyro's heater duty cycle from 10-12% to 26-38% revealed that additional heater power was compensating for the absence of motor current.

The second flex lead failure was expected. The first flex lead failed on August 31, 2007, after which Gyro 6 was turned on. The second flex lead's failure did not impact HST's operation."

  • submit to reddit


Loading




Join our mailing list




Commercialization: Monthly Archives

Monthly Archives

About this Entry

This page contains a single entry by Keith Cowing published on October 19, 2007 11:55 AM.

Son of COTS Announced was the previous entry in this blog.

JPL HSPD-12 Activity Has Ripple Effect Across NASA is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.