Sent: Monday, July 28, 1997 1:42 PM
To: ALGATE, ANDREW F. (JSC-DA8); AUSTIN, BRYAN P. (JSC-DA); BANTLE, JEFFREY W. (JSC-DA8); BRISCOE, ALAN L. (LEE) (JSC-DA); CASTLE, ROBERT E. (BOB) (JSC-DA8); DAVIS, SALLY P. (JSC-DA); DYE, PAUL F. (JSC-DA); FERRING, MARK J. (JSC-DA); HALE, N W., JR (WAYNE) (JSC-DA8); HAM, LINDA J. (JSC-DA8); HANLEY, JEFFREY M. (JEFF) (JSC-DA8); HILL, PAUL S. (JSC-DA8); KELSO, ROBERT M. (ROB) (JSC-DA); KIRASICH, MARK A. (JSC-DA); KWIATKOWSKI, THOMAS W. (TOM) (JSC-DA); PENNINGTON, GRANVIL A. (AL) (JSC-DA8); REEVES, WILLIAM D. (JSC-DA); SHANNON, JOHN P. (JSC-DA); SHAW, CHARLES W. (CHUCK) (JSC-DA8)
Subject: MCC-M Response

The above is a report I have drafted on the MCC-M response to the power loss incident which delayed the Mir EVA. It starts with what I think was a recoverable error (unplugging a key attitude sensor), but inaction by the ground allows the situation to deteriorate into a major problem. It is not completely clear from the information available, but it appears the ground may have even aggravated the situation with an incorrect quaternion uplink.

A classic example of the ground having their heads "up and locked"...


Loading

 



Monthly Archives

About this Archive

This page is an archive of entries in the Mir category from July 1997.

Mir: June 1997 is the previous archive.

Mir: August 1997 is the next archive.

Find recent content on the main index or look in the archives to find all content.