Dragon Cargo Craft Launch Scrubbed; Station Crew Preps for Spacewalk
“Monday’s launch attempt of the SpaceX Dragon cargo craft, loaded with nearly 5,000 pounds of supplies for the International Space Station’s Expedition 39 crew, was scrubbed due to a helium leak on the Falcon 9 first stage. The next launch opportunity would be Friday, April 18 at 3:25 p.m. EDT if the issue can be resolved.”
Helium Leak Delays SpaceX Launch
Comments are closed.

What does the first stage have helium for?
Do all rockets use helium?
Keeps the fuel tank pressurised as the fuel is used up.
Most do but the Shuttle used exhaust gas from the turbopumps to pressurize the external tank.
DTARS:
Actually, SpaceX uses pressurized helium to do a lot of things that others use hydraulics and explosive bolts for. Helium is inert, stores at high pressure for low weight and is non-toxic.
tinker
Helium is also very expensive. For Shuttle it was the most expensive fluid in the LV, costing more than the fuel or oxydizer.
It’s used to pressurize the propellant tanks and operate various pneumatic systems. Can’t speak for ‘all’ but the shuttle certainly did.
Do a little reading on how rocket tanks and engines work.
And I believe helium being used to extend the landing legs via helium driven pistons. Wonder if this new hardware was the cause of the problem. That is the one downside to SpaceX. We will probably never know.
The word I’m seeing is that it was related to the stage separation system, not the legs.
In addition to tank pressurization and pneumatics, Helium is also used to spin up the turbo pumps.
Stage separation doesn’t use helium, pneumatic pushers.
From SpaceX:
(F9) Interstage
The interstage is a composite structure that connects the first and second stages and holds the release and separation system. Falcon 9 uses an all-pneumatic stage separation system for low-shock, highly reliable separation that can be tested on the ground, unlike pyrotechnic systems used on most launch vehicles.
Well once again the cheap launcher is delaying because of a vehicle issue. Same story every launch campaign. And it screws up everybody else’s schedule. I forget how often does this happen to ULA? Oh I remember almost never. Dont forget Mars won’t wait forthese glitches it’ll jst keep on going
Reminds me of the shuttle program.
http://www.floridatoday.com…
http://www.spacenews.com/ar…
http://www.americaspace.com…
http://www.floridatoday.com…
http://www.redorbit.com/new…
And that’s just the last couple years, I didn’t bother going past 2012.
Matt:
Don’t feed the trolls!
We know that SpaceX has put America back on the map as the unassailed leader is space launch technology. Anyone thinking otherwise does not have their country’s best interests at heart.
Cheers:
tinker
When ULA gets even one launch contract for someone other than the taxpayers I’ll be happy to congratulate them. As to one launch delaying another, the problem lies with the DOD. After 50 years they are no closer to launching two LVs in the same day, or even allowing one to go instead of another in the event of a scrub.
That’s one reason why SpaceX want their own pads.
So far as ULA goes they are getting the odd commercial payload. Who knows what price they charge to get it though. I’d suspect well under what they charge government which together with their so-called ‘capability’ payments from DoD, would substantially subsidise a commercial payload anyway.
“The odd commercial payload”? Here’s the actual situation: ULA hasn’t launched a commercial payload in five years, and they have zero commercial customers on their manifest.
Then what are Worldview and Morelos-3 (AKA MEXSAT-2) on the Atlas manifest?
Why is that DOD problem? The flight rates don’t justify such a capabilities and the users aren’t going to fund it.
There have been numerous range conflicts over the past twenty years that have resulted in costly delays for other launches and cascading slips. The DOD gets plenty of taxpayer money, has a large contractor workforce, and has been talking about “range modernization” for at least the past 25 years, but nothing ever happens. It is simply not acceptable to take 24 hours to load a different program in a computer. If the FAA operated on that basis we would only have one flight a day out of JFK.
A few days is neither here nor there when the safety of the payload is at stake. All launchers suffer glitches at some time or another.
Consider their first launch this year. No delays or glitches there.
I take it you NEVER monitor launches other than SpaceX .. if you did, you could not have made that post with a straight face.
rockofritters – you must not follow much launch activity other than SpaceX to make a statement like that. I have participated in about 7 Delta launches and about half of them failed to make the first launch attempt for various reasons. We dont hear much about launch delays that occur weeks or months out. I didnt hear anyone complaining about Kepler’s launch delay due to bad 3rd stage separation timers, or other launches delayed due to not having enough backup LV batteries, or a stuck propellant valve at vandenberg delaying a launch from KSC, or a pad radar over-radiating a spacecraft and scrubbing 30 seconds before launch…. etc. etc.
Ah Helium, I hate leak checking helium systems, get it leak tight and if just the wind blows a little in a certain way and a leak will develop.
Can nitrogen be used to pressurise LOX and RP-1 tanks?
Well, SpX-CRS-3 is now berthed on station after what seems to have been a largely-uneventful approach and rendezvous. The ascent was flawless and I don’t think anyone reasonable can berate SpaceX for refusing to launch with even a redundant system having failed.
The landing tests for the core seem to have gone nominally (although it is quite possible that the core itself was destroyed in the 20-foot seas at the LZ). Now, focus is turning to the F9r Dev 2 vehicle, which will be flying exo-atmosphere return, entry, descent and landing tests from New Mexico Spaceport in the near future.
Most importantly, the latest picture from Hawthorne shows five Dragons in various states of production, of which two are very clearly the new Dragon-2 crewed variant. CDR is scheduled to take place in the next few weeks and, all going well (that lovely old spaceflight phrase) we might see Americans launching from LC-39A again as early as next year!
In summary, it is not unreasonable to predict that, by the end of 2016, SpaceX will be flying commercial (if not NASA) passengers and that the Falcon-9 core stage will be a reusable element of the system.