Mir 24 / NASA 6 Status Date: Thursday, January 1, 1998 Mission Day: Mir 24 / NASA 6 MD 149/98 Mir 24 CDR: Anatoly Solovyov Mir 24 FE: Pavel Vinogradov […]
Russia
Mir Status Report 23 December 1997
Date: Tuesday, December 23, 1997 // MD 140/89 Mir Station System/Subsystem Activities This past weekend, during changeout of the Base Block air conditioner compressor unit, a check valve failed inside […]
NASA MIR Program Mir 24 / NASA 6 Status
NASA MIR Program Mir 24 / NASA 6 Status Date:09 Wednesday, December 17, 1997 Mission Day:09 Mir 24 / NASA 6 MD 134/83 Mir Station System/Subsystem Activities All primary major […]
Mir Status Report 20 November 1997
NASA MIR Program / Mir 24 / NASA 6 Status Date: Thursday, November 20, 1997 // MD 107/56 Mir Station System/Subsystem Activities Today’s major activities centered on preparation and execution […]
Mir Status Report 19 November 1997
Date: Wednesday, November 19, 1997// MD 106/55 Mir Station System/Subsystem Activities Health of the major systems continue to remain unchanged (Kvant Electron working (periodically turned off/on for power), 11 gyrodynes […]
Mir Status 20 October 1997
Date: Monday, October 20, 1997 // MD 76/25 Mir Station System/Subsystem Activities The second IVA into Spektr was conducted today, and the crew connected two of the three cables for […]
Mir Status 19 October 1997
NASA 6 Status Date: Sunday, October 19, 1997// MD 75/24 Mir Station System/Subsystem Activities The Progress vestibule was successfully depressurized today. The station was commanded to free drift at DMT […]
Mir Status Report 5 October 1997
NASA MIR Program Mir 24 / NASA 6 Status Date: Sunday, October 5, 1997 Mission Day: Mir 24 / NASA 6 MD 61/10 Mir 24 CDR Anatoly Solovyov Mir 24 […]
Mir Status Report 24 September 1997
Date: Wednesday, September 24, 1997// MD 50/132 Mir Station System/Subsystem Activities All systems continued to function nominally today, except for the urine water recovery system, which has not yet been […]
Mir Status Report 23 September 1997
Date: Tuesday, September 23, 1997 // MD 49/131 Mir Station System/Subsystem Activities — The MCS is running normally and attitude control is being provided by 10 gyrodines. Elektron was reactivated […]
